RSRDC
 
Mail
Mail

Tenders

 
Sort by:
 
S.No. NIT No. Nature of Work Work Related Document Est. Cost Date of Sale Date of Opening P.D. Detail Remarks
1451 325 Road Construction of Jaipur-Nagaur Road from Km. 63/500 (Bhatipura) to Km. 101/700 (Narayanpur Tiraha) NIT
Corrigendum-NIT 1
Engineering Cost 1
41.18 crores 17-May-2012 6-Jun-2012 Sh. A.K. Singhal
1452 325 Road Construction of Jaipur-Nagaur Road from Km.152/0 (Kharwalia) to Km. 190/0 (Tarnau via Khatu) NIT
Corrigendum-NIT 1
Engineering Cost 1
32.34 crores 17-May-2012 6-Jun-2012 Sh. L.N. Sharma
1453 325 Supply_ Matterials Supply of Crusher broken Grit of various size at Hot Mix Plant site NIT
Corrigendum-NIT 1
Engineering Cost 1
6.00 crores 17-May-2012 6-Jun-2012 Sh. A.K. Singh
1454 325 Others Mixing, Transportation, Laying & Compaction of mixed material from Hot Mix Plant site to laying site NIT
Corrigendum-NIT 1
Engineering Cost 1
7.00 crores 17-May-2012 6-Jun-2012 Sh. A.K. Singh
1455 325 Road Construction of Kotputli-Sikar-Kuchaman Road Km. 125/0 (Sikar) to 166/0 (Losal) NIT
Corrigendum-NIT 1
Engineering Cost 1
35.00 crores 17-May-2012 6-Jun-2012 Sh. A.K. Singh
1456 324 Building Construction of workshop block in College of Engineering & Technology, Bikaner (Phase-III) NIT
206.00 lacs 17-May-2012 6-Jun-2012 Sh. Satish Sharma
1457 323 Building Construction of first floor & second floor on various labs in College of Engineering & Technology, Bikaner (Phase-III) NIT
96.00 lacs 17-May-2012 31-May-2012 Sh. Satish Sharma
1458 323 Building Construction of Toll Plaza on Jahajpur-Mandalgarh Road NIT
80.00 lacs 17-May-2012 31-May-2012 Sh.Anoop Gehrana
1459 323 Building Construction of Toll Plaza on Mahuwa-Hindaun-Karauli Road NIT
80.00 lacs 17-May-2012 31-May-2012 Sh. A.K. Singh
1460 322 Others Labour charges for premix patches at Alwar-Behror-Narnaul Road NIT
Corrigendum-NIT 1
1.50 lacs 14-May-2012 21-May-2012 Sh. Gautam Sharma
1461 322 Others Modificaton in weigh bridge from Mechanical to computrised weigh bridge NIT
Corrigendum-NIT 1
2.50 lacs 14-May-2012 21-May-2012 Sh. Gautam Sharma
1462 321 Others Development work between faculty block & school of Insurance at NLU, Jodhpur NIT
45.00 lacs 14-May-2012 21-May-2012 Sh. Yogendra Sharma
1463 320 Road Annual repair of Sri Ganganagar-Hanumangarh & Hanumangarh-Suratgarh BOT Road year 2012-13 NIT
Corrigendum-NIT 1
9.80 lacs 14-May-2012 21-May-2012 Sh. Sh. P.S. Agarwal
1464 32 Road Re-construction of Damaged CD work in Km. 49/800 near village Gudla on Mahuwa-Hindaun-Karauli Road (SH-22) NIT
Corrigendum-NIT 1
35.00 lacs 4-May-2015 25-May-2015 Sh. DR Srivastav
1465 32 Building Minor Repair Work at Ayurved Nursing Training Centre and Satellite Hospital, Magra-Punjla of RAU, Jodhpur (Excluding cost of Cement & Steel) NIT
4.82 lacs 20-May-2013 13-Jun-2013 Sh. Yogendra Sharma
1466 32 Supply_ Matterials Supply of spare parts for DG set 100 KVA NIT
1.50 lacs 19-May-2011 20-May-2011 Sh. Gautam Sharma
1467 32 Building Construction of 10-15 Capacity Women Barrack at Ist Battalion, RAC, Jodhpur. NIT
7.50 lacs 20-May-2013 13-Jun-2013 Sh. Yogendra Sharma
1468 319 Building Construction of Viaduct and service road for ROB at Km 857/29-858/1 on Modak-Dabhadey Section in place of L.C. No. 87 at 858/8-858/10 in District Kota NIT
Corrigendum-NIT 1
395.00 lacs 14-May-2012 1-Jun-2012 Sh. Ashu Garg
1469 318 Building Construction of Toll Plaza on Jodhpur-Osian-Phalodi Road NIT
160.00 lacs 14-May-2012 1-Jun-2012 Sh. Yogendra Sharma
1470 318 Building Construction of Toll Plaza on Gotan-Pundulu-Sojat Road NIT
240.00 lacs 14-May-2012 1-Jun-2012 Sh. R.K. Jhinjha
1471 318 Building Construction of Toll Plaza on Banswara-Ratlam Road NIT
80.00 lacs 14-May-2012 1-Jun-2012
1472 318 Building Construction of Toll Plaza on Bharatpur-Deeg-Alwar Road NIT
160.00 lacs 14-May-2012 1-Jun-2012 Sh. A.B. Pandey
1473 317 Others Toll collection on Mahwa-Hindaun-Karauli Road NIT
Corrigendum-NIT 1
1468.26 lacs 10-May-2012 12-Jun-2012 Sh. A.K. Singh
1474 317 Others Toll collection on Salumber-Keer ki Chowki Road NIT
Corrigendum-NIT 1
390.39 lacs 10-May-2012 12-Jun-2012 Sh. R.K. Phulwaria
1475 317 Others Toll collection on Chomu-Ajitgarh-Shahpura Road NIT
Corrigendum-NIT 1
Corrigendum-NIT 2
313.50 lacs 10-May-2012 12-Jun-2012 Sh. Avinash Sharma
1476 317 Others Toll collection on Pali-Nadol Road NIT
Corrigendum-NIT 1
195.88 lacs 10-May-2012 12-Jun-2012 Sh. Pratapmal Jain
1477 317 Others Toll collection on Fatehnagar-Dariba Road NIT
Corrigendum-NIT 1
361.97 lacs 10-May-2012 12-Jun-2012 Sh. Vishnu S. Meena
1478 317 Others Toll collection on Mangalwar-Nimbahera Road NIT
Corrigendum-NIT 1
718.17 lacs 10-May-2012 12-Jun-2012 Sh. A.K. Nag Choudhary
1479 317 Others Toll collection on Gotan-Sojat-Bilara Road NIT
Corrigendum-NIT 1
2401.53 lacs 10-May-2012 12-Jun-2012 Sh. R.K. Jhinjha
1480 316 Electrical Remaining/Additional HT/LT line shifting work at Sewar-Kumehar-Deeg Road NIT
20.00 lacs 7-May-2012 15-May-2012 Sh. Subhash Arya
1481 315 Building Various development works & renovation of toilets at 3rd floor at IGPRS, Jaipur NIT
14.50 lacs 11-May-2012 14-May-2012 Sh. O.P. Gupta
1482 314 Bridge Remaining work of ROB Bhartpur - Deeg-Alwar Road LC No. 244-B (excluding of cement & steel) NIT
235.00 lacs 7-May-2012 22-May-2012 Sh. A.B. Pandey
1483 314 Building Construction of Girls Hostel at Rajasthan Technical University, Kota NIT
210.00 lacs 7-May-2012 22-May-2012 Sh. Ashu Garg
1484 313 Electrical HT/LT line shifting work from Kharda Village Desuri to Mahawato Ka Guda (Rajasmand) NIT
40.00 lacs 3-May-2012 11-May-2012 Sh. P.C. Meena
1485 312 Road Misc. work (Providing fixing of Hume Pipe) for Development of Mangalwar-Nimbahera Road (MDR-11 A) in Km. 20/450 to 40/0 NIT
12.00 lacs 8-May-2012 9-May-2012 Sh. A.K. Nag Choudhary
1486 312 Road Misc. work (Providing fixing of Hume Pipe) for Development of Mangalwar-Nimbahera Road (MDR-11 A) in Km. 0/0 to 20/450 NIT
12.00 lacs 8-May-2012 9-May-2012 Sh. A.K. Nag Choudhary
1487 312 Bridge Remaining work of Construction of ROB (excluding railway portion) at LC No. 36-C, Kuchaman city-Makrana section on Manglana to Makrana road SH-2B in Km. 8 (part-1) NIT
Corrigendum-NIT 1
45.00 lacs 8-May-2012 9-May-2012 Sh. Rajesh Modi
1488 312 Building Repair of existing building & raising of Boundary wall at CFC Building, Kaithoon NIT
8.00 lacs 8-May-2012 9-May-2012 Sh. Ashu Garg
1489 312 Building Construction of Poly Carbonate Dome on circular portion of Library Block at MGS University, Bikaner Phase-III NIT
4.50 lacs 8-May-2012 9-May-2012 Sh. Satish Sharma
1490 311 Bridge Remaining work of ROB Dholpur-Rajakheda LC No. 463-B Dholpur NIT
Corrigendum-NIT 1
65.00 lacs 3-May-2012 15-May-2012 Sh. A.B. Pandey
1491 311 Electrical SITC of fire fighting & fire protection work at Proposed Construction of Shiksha Sankul at JLN Marg, Jaipur NIT
69.00 lacs 3-May-2012 15-May-2012 Sh. Santosh Sharma
1492 310 Building Construction of TAD Residential School for Sahriya Jan Janti Boys at Kawai, Distt. Baran NIT
Engineering Cost 1
477.36 lacs 23-Apr-2012 8-May-2012 Sh. B.R. Joshi, P.O.
1493 310 Building Construction of TAD Residential School for Sahriya Jan Janti Boys at Koyla, Distt. Baran NIT
Engineering Cost 1
475.73 lacs 23-Apr-2012 8-May-2012 Sh. B.R. Joshi, P.O.
1494 31 Others Auction of steel scrap at ROB Abu Road NIT
1.50 lacs 19-May-2011 20-May-2011 PD-Pali Sh. Pratapmal Jain 94141-52347
1495 31 Building Construction of Boundary Wall at Maharaja Ganga Singh University, Bikaner (Phase-III) NIT
46.50 lacs 20-May-2013 13-Jun-2013 Sh. Satish Sharma
1496 31 Electrical Electrical work in 10 Nos. upper subordinate quarters and 30 Nos. Lower subordinate quarters at RAC Vth Battalion, Jaipour NIT
55.00 lacs 5-May-2015 28-May-2015 Sh. P.C. Meena
1497 309 Others Making Structure work by dry masonary, rock cutting &soil filling for tree plantation in Satellite Machia Saffari Park, Jodhpur NIT
11.00 lacs 27-Apr-2012 30-Apr-2012 Sh. Yogendra Sharma
1498 308 Building Construction of facilities building at Machia Biological Park, Jodhpur NIT
60.33 lacs 23-Apr-2012 3-May-2012 Sh. Yogendra Sharma
1499 307 Building Construction of Administrative Building at Machia Biological Park, Jodhpur NIT
201.81lacs 23-Apr-2012 8-May-2012 Sh. Yogendra Sharma
1500 307 Building Construction of Hon’ble V.C. Residence & Guest House at Kota University, Kota NIT
250.00 lacs 23-Apr-2012 8-May-2012 Sh. Ashu Garg
Previous [ 1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  Pages ] Next [ 31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  48  49  50  51  52  53  54  55  Pages ]